Big wiring day. Rather fiddly due to the limited space on the left, but it worked. Having the Melzi on the right and resistors on the left would have given more space, but then the wires from the PSU might not have been long enough.

Comments

Popular posts from this blog

If only the sun flares in my photos were this impressive.